Primary School Playground- Just in Time for Summer!

11th May 2016

Last week Synthetic Turf Management were at St Cuthbert’s Primary School in Stockton preparing their primary school playground for summer. In May we see a surge in more people rushing to get their artificial turf surfaces ready and looking great for these summer months as increased usage means you should pay particular attention to these areas.

The EPIC surface at St Cuthbert’s consisted of a roadway, trim trail, shapes, number lines and benches as part of the play equipment.

overhead view of EPIC Playground

 Primary School Playground at St Cuthbert’s Primary School

Primary school playgrounds are a priority within education. As you probably are aware, learning doesn’t stop, especially at primary school age children pick up on everything around them and need to be inspired by the outdoor areas. We think that our EPIC primary school playground surfaces are full of colour and inspiration encouraging each and every student to spend more time outside exploring the world outdoors.

There’s more benefits too!

  • Attractiveness of the school grounds
  • Available in a variety of colours
  • Shock pads to cushion falls and hard landings
  • Suitable in all weather, all year round
  • British manufactured turf
  • 8 Year product warranty
  • A team of expert and dedicated installers
  • Bespoke surfaces with an additional CAD design
  • A continuous support team to help with any needs
  • Ongoing maintenance options (highly recommended)
  • Additional items to add such as play equipment

Roadway design 

Roadways are very popular as part of the surface as they can be used in P.E sessions of all different ages. STM always bear in mind the age of the children using the surface when we are designing the primary school playground surfaces to ensure the correct measurements cater to the ability and age of pupils.

Number Line Primary Playground 

Number lines are often included as part of the surface to bring mathematics outdoors and reiterate learning to children.

EPIC primary school Playground characters 

The colourful turf in this project attracted children to the surface and encourages healthy active lifestyles.

EPIC primary school playground fencing

STM can also provide fencing solutions to your playground to promote a safe environment for all children.

Primary school playgrounds should get paid particular attention when it comes to the learning and development of pupils, particularly for the younger ages. Remember most children spend up to 2 hours a day in their playgrounds therefore it is important to ensure a safe, active, educational and creative environment for all to enjoy!

Contact Us

For more information on how we can help, please use this contact form to send us a message.

Or contact us directly at:

Due to our rural location and occasional power outages please contact 07760 759 716 if the landline number is not available.

Opening hours

Monday 8:30 - 17:00
Tuesday 8:30 - 17:00
Wednesday 8:30 - 17:00
Thursday 8:30 - 17:00
Friday 8:30 - 17:00
Saturday Closed
Sunday Closed

*Please note we are closed for all public bank holidays.