- About
- Services
- Play
- Sport
- Case Studies
- News
- Contact
- Pitchbuilder
We have just completed yet another playground installation with our bespoke epic product and boy does this looks incredible!
Ever been on duty in the school playground and walked over an uneven surface thinking the concrete is getting that little bit too crumbly. Perhaps you are fed up of having to transfer playtime indoors because the natural grass will get so damaged beyond repair with the children walking over it in the wet weather. Perhaps you just think that the playground needs a good refurbishment, a splash of colourful! Well you can get just that with Synthetic Turf Management and our unique convenient playground installations which can last up to a huge 20 years! That’s 8000 children who would benefit from an artificial turf surface (based on an average primary school of 400 children).
Monega Primary School in East Ham, London were delivered an EPIC playground installation in August 2016 in preparation for the new school year. Therefore, we made sure that we were in when the students broke up for the 6 weeks’ holidays and out before it ended however this playground installation only took a few days! Yes a few days, that’s how convenient we try to make it for you.
Monega wanted something completely individualised that would transform the existing surface and provide a safe environment for all of their pupils. EPIC was the preferred product. This ‘Education and Play in Colour’ is designed to be able to use as a tool to create learning methods outside of the classroom so that children can extend their learning outdoors. The playground installation was completed with 586 square metres of EPIC which consisted of green, blue and red turf. We also supplied and installed the playground installation equipment.
Artificial turf must be installed correctly, especially at an installation like Monega as there is so much cutting out installed.
During the carpet installation at Monega
Take a look at the finished Monega Primary synthetic turf playground installation. This one is stunning!
A full view of the new playground installation
Such a neat design that will be low maintenance and packed with fun, laughter and well… education!
A red roadway with traffic lights
Play equipment with a blue surrounding sea
A Teletubbies tunnel! This part of the playground installation has been incredibly popular this year at STM
Well what are you to do next? When you approach the school grounds on that dreaded first week in September, think of Monega Primary and what their teachers/staff/facilities personnel get to walk into. The colours go down a hit with children and exploring the outdoor environment is a real must for their education!
STM operate all over the UK and can create something completely bespoke, completely convenient and completely cost effective!