So.. Summer feels like a distant memory now. It was all go for us! Lots of exciting projects up and down the country.

St Pats - Thornaby

  • Base preparation and patching

  • 5mm preformed pad

  • STM - Sand Dressed 24mm multi use surface

  • Sand Infill 10kg per m2

  • Two Tone Green and Blue with a Rust Running Track.


Darlington

  • Base preparation and patching

  • 15mm instiu pad

  • STM - Sand Dressed 24mm multi use surface

  • Sand Infill 10kg per m2

  • Two Tone Green with Blue surround.



 Birmingham

  • Full Pitch Maintenance



Walworth Academy - London

  • Base preparation and patching

  • 15mm instiu pad

  • STM - Sand Dressed 24mm multi use surface

  • Sand Infill 12kg per m2

  • Installed 3g Pitch

  • Green 3G Surface And Blue Sand Dressed Multi Use Pitch.



West Heath - Birmingham

  • Base preparation and patching

  • 5mm Roll Out Pad

  • STM - Sand Dressed 15mm multi use surface

  • Sand Infill 10kg per m2