- About
- Services
- Play
- Sport
- Case Studies
- News
- Contact
- Pitchbuilder
18 months ago, St Gerards School Trust approached Synthetic Turf Management (STM) with a vision: to transform their ageing tarmac Multi-Use Games Area (MUGA) into a versatile, high-quality artificial grass facility fit for modern school sport.
Covering 1,500m², the brief was not only to upgrade the surface but also to improve the safety, appearance, and long-term functionality of the entire space.
After a full site assessment and consultation, STM proposed a complete redesign of the area to unlock its full potential:
Removal of the existing breezeblock walls, opening up the MUGA and making it feel more inviting and user-friendly.
Installation of a new 3m high twin-bar fence system, including super rebound panels to the lower 1.2m to withstand heavy use and increase safety.
Specification of a 10mm shockpad beneath the surface to enhance shock absorption and player comfort.
Installation of Sterling Turf Durapro, a robust synthetic surface accredited to FIH Multi-Use standards, complete with a 12-year warranty.
The upgraded MUGA now supports Tennis, Netball, and Football, making it an incredibly flexible facility for day-to-day school use and extracurricular sport. Clear multi-sport line markings ensure easy transitions between activities, helping maximise usage and participation.
To further increase value and community benefit, the school plans to rent out the MUGA in the evenings. As part of this future-proofing strategy, they are exploring the addition of floodlighting, pending planning permissions and funding.
✅ Surface: Sterling Turf Durapro with 10mm shockpad
✅ Size: 1,500m²
✅ Fencing: 3m high twin-bar fencing with super rebound lower panels
✅ Markings: Tennis, Netball, Football
This project is another great example of how STM works in partnership with schools to deliver smart, durable, and future-ready sports facilities. Whether you’re upgrading an outdated surface or building something entirely new, we tailor every detail to your needs—from surface specification to long-term planning support.
Interested in upgrading your own MUGA? Get in touch at info@stmworld.co.uk
Or start designing your dream facility today with our free Pitch Builder Tool