Leeds Primary School MUGA

education

Resurfacing a school sports pitch at a Leeds Primary School for MUGA. Complete in March 2019.

The Specification:

Base

Uplift and removal of existing stone base along with soil. Type 3 base build and dust binding layer

Surface

TigerTurf Evo Pro

Infill

Sand infill at a rate of 12kg per square metre

Size

1296 square metres


Extras

Installation of Pin Kerbs
Uplift & removal of existing synthetic grass
Markings

Football, netball and multi-sport

Colour

Predominantly Green with different red, yellow and white colour line markings

Location
Leeds, Yorkshire


Project Manager


Jon Bell, Managing Director

Contact Us

To discuss your synthetic turf needs, don’t hesitate to contact by clicking below.

Or contact STM on 01642 713555 or info@stmworld.co.uk.

Get in Touch

Pitch Builder

Try the Pitch Builder, so that you can visualise your pitch/court before its construction. Click below to get started.

View

Case Studies

Click the links below to browse individual
artificial turf projects we have installed: